SS27 campaign On set · day 2 of 3
Day 1Mon 5 Oct Wrapped
Stills against limestone · looks 1–8
8 of 8 looks · 16 stills selected
Day 2Tue 6 Oct On set
Stills and walking film · looks 9–16
5 of 8 looks · look 14 shooting now
Day 3Wed 7 Oct Confirmed
Film cut-downs · looks 17–22
6 looks · reshoot hold asked for 14 Oct
Talent 3 booked · €108,000 in fees
Send a package TalentDaysUsageFeeContract
Today on set Paris time · now 18:20
Updated by Théo Bastide · 18:05- 11:30 Hair and make-up Amara and Luca, trailer 2
- 13:30 Call on set Both on time, wardrobe signed off
- 14:10 Looks 9–13 Stills on the limestone wall
- 17:40 Look 14 Walking film, two takes left
- 19:00 Looks 15–16 Stills, Luca alone
- 21:00 Wrap Producer’s estimate; car booked
Selects from day 1 16 of 412 frames
A-0112
A-0147
A-0203
M-0061
S-0019
L-0008