BracelBracel Sima Daro
Saturday editionLeon reviews at 16:00, the edition closes at 18:00

Good afternoon, Sima. Two things need you before 18:00.

5h 20m left 5 questions in progress Saturday ferry brief, 3 of 4 claims in

Waiting on you

2Clear both before Leon’s 16:00 review
Leon Bex

Leon Bex asked about claim 02

11:31
Is the 19 September date in the council minutes firmer than the harbour notice? Put the two side by side for me before I sign off.
DisputedClaim 02 · Saltgate, 12 or 19 SepHBCC

Claim 04 needs a second record

since 11:20

Strait Ferries operates all of the new weekend sailings. Only the operator’s own bulletin says so, so the claim stays out of the report.

One sourceSFStrait Ferries service bulletin, section 1

Questions in progress

5
Record blocks show how many records each run has readAll questions

Recent answers

History
A ferry crossing toward a terminal at first light, the cover of the Saturday ferry briefReport draft
Saturday ferry briefPage 4, Saturday edition
5h 20mto close
  • 11:20Run 2 finished, 4 claims checked
  • 16:00Leon Bex reviews the brief
  • 18:00Edition closesMalik Osei
01Eastwick Pier, weekends from 5 Sep
02Saltgate, 12 or 19 SepDispute shown
03Corran Quay, weekdays only
04Strait Ferries runs themNeeds a record
3 of 4 claims in the reportOpen outline

Team activity

  1. Tomas Riedl started a run on the Corran Quay slipway question

    11:42
  2. Malik Osei copy-edited the outline of

    Saturday ferry brief
    12:05
  3. Leon Bex asked about the Saltgate start date

    Claim 02, disputed
    11:31
  4. Sima Daro added claim 03 to the report

    Corran Quay, weekdays only
    11:24
  5. Ines Marlow moved the ferry brief to page 4

    10:40
  6. Aiko Brandt finished the harbour fees question, 14 records

    09:52
6 people in Quayside DispatchAll activity