Two Brightway Charge DC fast chargers in a wet parking lot at dusk, both showing green status lights
Brightway Charge

Brightway stopped rolling trucks
for stuck latches.

A 412-port network across Texas used to send a technician for almost every fault. Six months on Salve later, seven out of ten incidents close before anyone is awake.

71%incidents fixed without a truck
1m 48smedian time to resolve
98.6%uptime, up from 94.1%
$212ksaved in the first 6 months
CustomerCharge point operator
HeadquartersAustin, Texas
Network412 ports · 38 sites
PlanOperations
On Salve sinceMarch 2026

Brightway’s operations team used to start every morning with a list of chargers that broke overnight. Now they start it with a list of chargers that broke, were fixed, and were tested again, all before 7 AM.

Forty truck rolls a month, most for nothing

Brightway Charge runs 412 fast-charging ports across 38 sites in Texas: grocery lots, travel plazas on I-35, and parking garages in Austin, Dallas and San Antonio. Uptime is part of their state grant, and every hour a charger sits faulted counts against it.

Until this year, nearly every fault ended the same way. An alert at 2 AM, an on-call engineer who could not tell from the error code what had happened, and a truck sent out in the morning. In January alone, Brightway rolled 39 trucks. Their field lead estimated that more than half of those visits ended with a technician pressing a reset button.

“We were paying a two-hour drive to press a button. Everybody knew it, nobody could prove which faults were which.”
Dana Whitaker · VP of Network Operations

412 ports connected in 11 days

Brightway kept its existing charging platform. Salve was placed in front of it in proxy mode, so every message passed through untouched and drivers saw no change. The team connected one garage in Austin on a Tuesday afternoon, watched it for a week, then moved the remaining 37 sites in batches of five.

For the first two weeks, playbooks ran in watch-only mode: Salve diagnosed every fault and wrote down what it would have done, without touching a charger. Dana’s team reviewed those suggestions each morning and approved three playbooks: unlock and reset for stuck latches, reconnect for communication errors, and a power-meter reboot.

Truck rolls a month, 2026All 38 sites · Salve live from March 12BeforeWith Salve
39Jan
41Feb
24Mar
16Apr
14May
13Jun
15Jul
14Aug
Go-live

What a night looks like now

The on-call phone still exists, but it rings only when a rule says it should: three or more ports down at one site, or a fault that two remote fixes could not clear. Everything else waits for the night report, which lands at 7 AM.

When a truck does go out, it goes with a pre-filled work order: the likely cause, the part to bring and the evidence. Brightway’s field partner now fixes 93% of those visits on the first trip, up from about 60%.

A field technician replacing a part inside an open DC fast charger cabinet, a tablet resting on the cabinet edge
A partner technician on a pre-diagnosed visit: one trip, the right part, the evidence on the tablet.

What comes next

Brightway is adding 120 ports along the I-10 corridor this year, all connected to Salve from day one. They are also moving their federal NEVI reporting into Salve, so the quarterly filing comes straight from the same uptime data the team watches every day.

Dana Whitaker with a coffee in the Brightway operations room at dusk
Dana Whitaker, VP of Network Operations, in Brightway’s operations room in Austin.
“Nobody gets up at 3 AM for a stuck latch anymore. We read the night report over coffee.”
Dana Whitaker · VP of Network Operations

More customer stories

Other networks, same quiet nights.

All customer stories
Voltline charging site in Phoenix, AZ
Voltline380 ports
64%fewer truck rolls

“The truck goes out with the right part, to a charger Salve already tried twice.”

Marcus ReyesDirector of Field Operations
Phoenix, AZCharge point operators
Mesa Mobility charging site in Albuquerque, NM
Mesa Mobility612 ports
2.4 moto pay back the yearly plan

“We had been paying trucks to drive two hours and press a reset button.”

Elena OrtizVP of Finance
Albuquerque, NMFleets
Lakeshore Transit charging site in Chicago, IL
Lakeshore Transit96 ports
1 dayto file the NEVI quarterly report

“Our reports used to take a week of spreadsheets. Now we check them and press submit.”

Angela BrooksProgram Manager, Electrification
Chicago, ILPublic agencies

Your night report could look like this.

Connect one site, watch Salve in watch-only mode for a week, and decide with your own numbers.