NEVI reporting

Keep every port above 97%. File in one click.

Federally funded chargers have to stay up and prove it. Salve tracks uptime port by port, warns you before a station slips, and prepares the filing your state asks for.

Uptime budget

97% leaves 262 hours a year.Salve shows what’s left.

At 97%, each port can be down about 262 hours a year. Pick a station to see how much of that budget it has used, and when it would run out at its current pace.

Year to date, January 1 to October 25. Excluded outages are not counted.

Downtime budget usedRainey Street LotAt risk
87%of 262 hours
Jan 1TodayDec 31
229 hhours down so far34 hhours left this yearRuns out Dec 8at the current pace

How uptime is counted

Not every outage is your fault.Salve sorts them, with proof.

Uptime is measured per port, minute by minute, from the messages your chargers already send. Each minute lands in one of three buckets.

Counts

Counted against you

A port that cannot start or finish a session, stops reporting, or charges far below its rated power.

Excluded

Excluded, with evidence

Grid outages, scheduled maintenance, vandalism and vehicle-side failures. Salve tags each one and attaches the proof.

Review

Flagged for review

Anything Salve cannot classify on its own goes to your team before the report is built, never silently.

Salve follows the federal uptime method and your state program’s guidance. It is reporting software, not legal advice: your program office has the final word on what counts.

From messages to filing

Four steps, all automatic.You review, Salve does the rest.

The same data that runs your night shift builds your report, so nothing is copied between spreadsheets.

  1. 01CollectEvery status message, session and error, per port, since the day you connect.
  2. 02ClassifyDowntime sorted into counted, excluded and review, with the evidence attached.
  3. 03Warn earlyA station that will miss 97% by year end gets flagged months before it does.
  4. 04FileQuarterly and annual reports in your state’s format, reviewed by you, submitted in one click.
State formats readyTexasCaliforniaColoradoArizonaGeorgiaFloridaIllinoisNew YorkWashingtonVirginiaOhioMichiganand 29 more
“Our reports used to take a week of spreadsheets. Now we check them and press submit. And we knew in June which station was at risk.”
Lakeshore TransitAngela BrooksProgram Manager, Electrification

Reporting questions

Questions from program managers.Short answers.

Which programs does Salve report for?

The federal NEVI program and most state programs built on it. If your state uses its own template, we add it before your first filing.

Do we need new hardware?

No. Uptime comes from the OCPP messages your chargers already send. Salve connects through a backend URL change.

Can we keep our current CSMS?

Yes. In proxy mode Salve reads every message on its way to your CSMS, so reporting works without moving platforms.

Who checks an exclusion?

You do. Salve proposes each exclusion with its evidence, and nothing goes into a filing until someone on your team approves it.

See your stations’ uptime budget.

Connect your funded sites and we’ll show where each one stands against 97%, before your next filing is due.